Bulk Water Main to Khayelitsha

  • City Of Capr Town
  • R28m
  • Nov 23, 2023
  • Completed

Bulk Water

The objective is the investigation, design and construction of an additional bulk water supply pipeline and pressure reducing station, which supplies Khayelitsha. The project comprise of approximately 6 km of water pressure-pipelines of diameters varying from 1200mm to 600mm. The pipeline extends from its northern tie-in at the existing 2.4m diameter pipeline, alongside Baden Powell Drive, to Mew Way at the southern end.